Key Metrics Dashboard

156 Total Tasks
57.7% Completion Rate
12 Plans Tracked
342 Comments

Status Distribution

Priority Breakdown

High
34
Medium
78
Low
44

Category Breakdown

HVAC
45
Electrical
38
Plumbing
32

Assignee Performance

Joseph Jose
28
Sevyn Romero
24
Bryson D.
22

Activity Health

With Pinned Plan
134
With Checklist
112
With Attachments
89

Install HVAC Unit - Suite 2301

Completed High
HVAC / Central Air Units
Suite 2301
Joseph Jose
Floor 23 - Mechanical Layout
Mar 15, 2026 - Mar 22, 2026
Split AC Unit
Location Pin Snapshot
Pin Snapshot

Checklist (100%)

Unbox and inspect unit
Mount bracket on wall
Connect ductwork
Wire electrical connections
Test airflow and temperature

Tags & Flags

Urgent Floor 23
Inspection: Passed Warranty: 5-Year

Attachments (3)

hvac-installed-front.jpg
hvac-serial-number.jpg
ductwork-connection.jpg

Comments & Activity

JJ
Joseph Jose Mar 20, 2026 04:00 PM
Installation complete. Airflow tested at 450 CFM - within spec. Temperature differential confirmed at 18°F.

Fire Sprinkler Head Replacement - Floor 15 Corridor

Deficiency High
Fire Safety / Sprinkler Systems
Corridor 15-A
Sevyn Romero
May 01, 2026 - May 05, 2026
Floor 15 - Fire Safety Layout
Bryson Donaldson
Location Pin Snapshot
Pin Snapshot

Checklist (2/4 Completed)

Shut off water supply to section
Remove damaged sprinkler head
Install new sprinkler head
Pressure test at 150 PSI for 2 hours

Evidence Attachments

damaged-sprinkler.jpg
water-damage-ceiling.jpg

Status Notes

AF
Admin FieldWire May 03, 2026 09:20 AM
Marking as deficiency - replacement delayed due to supply chain issue. New ETA: May 8.
Related Task: Ceiling Repair - Floor 15 Corridor (TO_INSTALL)

Electrical Panel Upgrade - Basement Level B2

To Install Medium
Electrical / Main Distribution
Basement B2
Octavia Correa
Basement B2 - Electrical Layout
Jun 10, 2026 - Jun 15, 2026
400A Panel Board
No plan pin snapshot provided for this task.

Upgrade Checklist (0/8)

Obtain electrical permit
Schedule power shutdown
Disconnect existing panel
Install 400A panel board
Run new feeder cables
Label all circuits
Perform load test
Inspector sign-off

Specifications & Documentation

current-panel-photo.jpg
PDF
panel-upgrade-spec.pdf

Planning Notes

AF
Admin FieldWire May 28, 2026 02:30 PM
Building management confirmed power shutdown window: June 10, 6:00 AM - 2:00 PM (8 hours). Attached approval PDF for records.