Location Pin Snapshot
Checklist (100%)
Wire electrical connections
Test airflow and temperature
Tags & Flags
Urgent
Floor 23
Inspection: Passed
Warranty: 5-Year
Attachments (3)
hvac-installed-front.jpg
hvac-serial-number.jpg
ductwork-connection.jpg
Location Pin Snapshot
Checklist (2/4 Completed)
Shut off water supply to section
Remove damaged sprinkler head
Install new sprinkler head
Pressure test at 150 PSI for 2 hours
Evidence Attachments
damaged-sprinkler.jpg
water-damage-ceiling.jpg
No plan pin snapshot provided for this task.
Upgrade Checklist (0/8)
Disconnect existing panel
Specifications & Documentation
current-panel-photo.jpg
PDF
panel-upgrade-spec.pdf
Comments & Activity